Collections Online
Amgueddfa Cymru – Museum Wales
Advanced Search
Esso Oil Refinery, photograph
The 'big lift' for the top section of the fractionating tower on the Primary Distillation Unit. The section was placed by a tower crane & then welded into position on this two-stage atmospheric bype tower during construction in October 1959
Photograph has typed caption from Esso Petroleum Co. Ltd., Public Relations Department, on reverse and is stamped with credit line and photographer's stamps. See inscription.
Collection Area
Industry
Item Number
62.141/18
Creation/Production
Studio Jon
Esso Petroleum Company Limited
Date: 1959 –
Acquisition
Donation, 4/5/1962
Measurements
Length
(mm): 248
Width
(mm): 199
Techniques
black and white (monochrome photograph)
photograph
Material
paper
Location
In store
Comments are currently unavailable. We apologise for the inconvenience.