Images of Industry
Llanelly Railway & Dock Co. 2-4-0 locomotive "Napoleon III"
photographer unknown
Date: late 19th century
Media: photograph
Size: 147 x 203 mm
Acquired: 1938; Gift
Accession Number: 38.57/28
The locomotive was built by Kitson & Co in 1868 as GWR no.894.
Comments - (3)
Hi there Ian,
Thanks for your enquiry. I will pass this comment on to the curator of 'Images of Industry' and post his response here when I receive it.
Sara
Ian Stubbs
On 31st October 1868 a tyre on one of the leading wheels broke and the engine become derailed and several passengers were injured.
The Llanelly Railway was taken over by the Great Western Railway on 1st January 1873 (but not amalgamated until 1st July 1889).
Napoleon III was rebuilt at Wolverhampton GW Works in June 1892 and it as shown above. Finally withdrawn in December 1906 it had a final mileage (from 1870) of 720,253.